University of Twente Student Theses

Login

Reducing the throughput time at machine-builder X

Dongen, J.A. van (2020) Reducing the throughput time at machine-builder X.

[img] PDF
1MB
Abstract:The throughput time of the machines built by Machine-builder X needs to be decreased, where this is a demand from customers of Machine-builder X. Some of the materials (purchasing decisions) that are required for building the machine have long lead times, extending the throughput time. With the design of a solution method, a better approach for these purchasing decisions is identified and can be recommended to reach a throughput time of four months.
Item Type:Essay (Bachelor)
Faculty:BMS: Behavioural, Management and Social Sciences
Subject:58 process technology, 85 business administration, organizational science
Programme:Industrial Engineering and Management BSc (56994)
Link to this item:https://purl.utwente.nl/essays/82141
Export this item as:BibTeX
EndNote
HTML Citation
Reference Manager

 

Repository Staff Only: item control page